Boeing B737 MAX - Electrical

0%

When the STANDBY POWER Switch is OFF:

Correct! Wrong!

The switched hot battery bus is powered whenever:

Correct! Wrong!

Transformer rectifier (TR) units and the main battery/battery charger supply DC power.

Correct! Wrong!

The TR3 cross bus tie relay automatically opens at glide slope capture to:

Correct! Wrong!

Illumination of the GEN BUS OFF light indicates:

Correct! Wrong!

A high oil temperature in the IDG would cause an automatic disconnect of the IDG.rnrnrn

Correct! Wrong!

Illumination of the STANDBY POWER OFF light indicates:

Correct! Wrong!

The IDGs contain the generator and drive in a common housing, and are lubricated and cooled by a external oil system attached to the gearbox.

Correct! Wrong!

The IDGs contain the generator and drive in a common housing, and are lubricated and cooled by a self-contained oil system.

During cruise, one engine driven generator drops off-line. Indications that the crew should see include:

Correct! Wrong!

AUTOMATIC LOAD SHEDDING (ENGINE GENERATORS) - For single generator operation, the system is designed to shed electrical load incrementally based on actual load sensing. When configuration changes to more source capacity (two generator operation), automatic load restoration of the main busses, galley busses and IFE buses occurs. Manual restoration of galley and main bus power can be attempted by:

Correct! Wrong!

Advertisement

Either generator or the APU can power both transfer buses. In the event a power source fails, what is required for that transfer bus to be powered by the opposite transfer bus power source?

Correct! Wrong!

One basic principle of operation for the B737 electrical system is:

Correct! Wrong!

The TR UNIT will illuminate in flight if:

Correct! Wrong!

DC voltage and amperage may be read on the DC voltmeter and ammeter for the battery and each of the 3 TRs. The Standby power and battery bus displays only Dc voltage. Normal indication is ______ volts

Correct! Wrong!

The Engine Integrated Drive Generators (IDGs):

Correct! Wrong!

With external DC power connected to the external DC power receptacle:

Correct! Wrong!

Normal AC voltmeter indication for the APU generator with the AC busses loaded:

Correct! Wrong!

If the AC source powering a transfer bus fails, the transfer bus will remain unpowered.

Correct! Wrong!

What is the purpose of the GROUND SERVICE switch?

Correct! Wrong!

Enables servicing airplane using external power without activating AC transfer busses.rn

DC voltage and amperage may be read on the DC voltmeter and ammeter for the battery and each of the three TRs. The standby power and battery bus displays only DC voltage. Normal indication is:

Correct! Wrong!

During primary charge cycle operation battery voltage can be as high as 30 +/- 3 volts

Advertisement

DC busses powered from the battery following a loss of both generators are:

Correct! Wrong!

After the loss of all generators, two fully charged batteries have sufficient capacity to provide standby power for a minimum of:Two fully charged batteries have sufficient capacity to provide standby power forrna minimum of

Correct! Wrong!

For ground service, a ground service switch is available on:

Correct! Wrong!

The illumination of the GND POWER AVAILABLE light indicates:

Correct! Wrong!

The main and auxiliary batteries also provide backup power for the DC standby system only.

Correct! Wrong!

The main and auxiliary batteries also provide backup power for the AC and DC standby system.

The main battery charger is powered through:

Correct! Wrong!

What is the source of power for TR2?

Correct! Wrong!

Which is the power source for the AC standby bus?

Correct! Wrong!

The cross bus tie relay:

Correct! Wrong!

With the STANDBY switch in the AUTO position, the loss of all engine or APU electrical power results in the automatic switching from the normal power source to the alternate source for standby power:

Correct! Wrong!

Advertisement

Illumination of the BAT DISCHARGE light indicates:

Correct! Wrong!

Galley busses are powered from:

Correct! Wrong!

The 115V AC Standby Bus is powered by:

Correct! Wrong!

On the ground, with the BATTERY switch OFF and STANDBY POWER Switch in BAT, the switched hot battery bus is:

Correct! Wrong!

On the ground, with the battery switch OFF and STANBY POWER Switch in AUTO, the Battery Bus is:

Correct! Wrong!

It is possible to power one transfer bus with external power and the other transfer bus with the APU?

Correct! Wrong!

What is the source of power for TR3?

Correct! Wrong!

Illumination of the blue GEN OFF BUS light indicates:

Correct! Wrong!

The purpose of the AC ground service bus is to power:

Correct! Wrong!

The auxiliary battery operates in parallel with the main battery when the battery is powering the standby bus.

Correct! Wrong!

Advertisement

Which bus supplies electrical power to the auxiliary battery charger?

Correct! Wrong!

Both On the ground and in flight a amber ELEC light comes on to indicate that a fault exists in DC power system or standby power system.

Correct! Wrong!

The ELEC light is inhibited in flight.

What is the significance of an illuminated ELEC light?

Correct! Wrong!

Each IDG supplies its own bus system in normal operation and can also supply essential and non-essential loads of the opposite side bus system when one IDG is inoperative.

Correct! Wrong!

Because engine generators power the transfer busses directly, and transfer busses are connected by a bus tie system, the loss of an engine driven generator will not necessarily result in the loss of any bus(ses).

Correct! Wrong!

The GROUND POWER AVAILABLE light will extinguish when:

Correct! Wrong!

The ELEC light will illuminate in flight if:

Correct! Wrong!

In flight if APU is the only source of electrical power:

Correct! Wrong!

The TR3 Disconnect Relay:

Correct! Wrong!

When the aircraft batteries is the only source of power:

Correct! Wrong!

Advertisement

The purpose of the cross tie relay is to:

Correct! Wrong!

AUTOMATIC LOAD SHEDDING (ENGINE GENERATORS) - For single generator operation, the system is designed to shed electrical load incrementally based on actual load sensing. What is the first bus that is shed?

Correct! Wrong!

Both AC Transfer busses can be powered simultaneously by:

Correct! Wrong!

In flight, if the APU is supplying both AC Transfer busses, positioning the BUS TRANS switch to OFF will:

Correct! Wrong!

Boeing 737 MAX - Electrical