[featured_image]
  • Version
  • Download 13
  • File Size 6.55 MB
  • File Count 1
  • Create Date 13 March 2024
  • Last Updated 13 March 2024

Bombardier CRJ CFIT During Approach

On an ILS approach the aeroplane deviated progressively to the left of the normal runway approach track. It passed above and then below the glide path and descended until it touched the more than 1 NM before the runway threshold. The aeroplane struck several obstacles and caught fire.

Attached Files

FileAction
Bombardier_CRJ-CFIT_During_Approach.pdfDownload